Fact Sheet
Demolition and Cleanup
Before starting a demolition, the person or
persons in charge must adequately prepare for the task with regard to the
health and safety of the workers. These preparatory operations involve the
overall planning of the demolition job, including the methods to be used to
bring the structure down, the equipment necessary to do the job, and the
measures to be taken to perform the work safely. Before doing demolition work,
inspect available personal protective equipment (PPE), and select, wear and use
the PPE appropriate for the task.
Demolition work involves many of the same
hazards associated with construction work. However, demolition also poses
additional hazards due to unknown factors such as: deviations from the structure's
original design, approved or unapproved modifications that altered the original
design, materials hidden within structural members, and unknown strengths or
weaknesses of damaged materials. To counter these unknowns, all personnel
involved in a demolition project need to be fully aware of these types of
hazards and the safety precautions available to control these hazards
Glosary:
Regard: Recomendações
Overall:
Totálitário, Inteiro
Planning:
Planejamento
Task:
Tarefa
Hidden: Escondido
Counter:
Balcão
Involved: Involvidos
Need: Necessita
Aware:
Alerta/ciente/
Availabel:
Disponível
Demolição e Limpeza
ReplyDeletePreparos e cuidados que se deve ter para realizar uma demolição.
Cuidado com os equipamentos e as pessoas que irão trabalhar. A verificação dos Epi's necessários.
As demolições tem riscos escondidos e todos devem estar cientes destes riscos
Laene Fonseca Vilas Boas