Wednesday, November 4, 2015

Demolition and Cleanup

FactSheet Logo Fact Sheet
Demolition and Cleanup
Before starting a demolition, the person or persons in charge must adequately prepare for the task with regard to the health and safety of the workers. These preparatory operations involve the overall planning of the demolition job, including the methods to be used to bring the structure down, the equipment necessary to do the job, and the measures to be taken to perform the work safely. Before doing demolition work, inspect available personal protective equipment (PPE), and select, wear and use the PPE appropriate for the task.
Demolition work involves many of the same hazards associated with construction work. However, demolition also poses additional hazards due to unknown factors such as: deviations from the structure's original design, approved or unapproved modifications that altered the original design, materials hidden within structural members, and unknown strengths or weaknesses of damaged materials. To counter these unknowns, all personnel involved in a demolition project need to be fully aware of these types of hazards and the safety precautions available to control these hazards

Glosary:
Regard:  Recomendações
Overall: Totálitário, Inteiro
Planning: Planejamento
Task: Tarefa
Hidden:  Escondido
Counter: Balcão
Involved:  Involvidos
Need: Necessita
Aware: Alerta/ciente/

Availabel: Disponível

1 comment:

  1. Demolição e Limpeza

    Preparos e cuidados que se deve ter para realizar uma demolição.
    Cuidado com os equipamentos e as pessoas que irão trabalhar. A verificação dos Epi's necessários.

    As demolições tem riscos escondidos e todos devem estar cientes destes riscos


    Laene Fonseca Vilas Boas

    ReplyDelete